Main operation: The
operation rate of the machines should be enhanced by standardizing the work or
rationalizing the of control method. Rationalized types of machine should be
introduced. Ancillary facilities should be used effectively. Attachments should
be adopted.
Sewing, operating an iron,
Pressing, Actuation of the pulley, thread take-up and needle bar, processing
the material.
Associated operation: Material
handing devices should be adopted. Work benches and tacks should be improved.
Training in machine operations should be developed. The material setting method
should be improved.
Picking up, Placing, Changing the holding position, and
setting (the materials), Cutting the thread, Fitting
Condition arrangement: The
lot size should be increased. Workers should be assigned to shared work (to
simplify the work allotted to each worker). Spare sewing machines and irons
should be made available. The equipments should be installed in their
predetermined locations.
Checking the instructions, Replacing the attachment,
Adjusting the height of the chair, Spraying silicon, Adjusting the tension of
the bobbin thread, Checking the temperature of the press and iron.
Product arrangement: The
processes should be well-balanced. The processing order should be standardized.
The shelves for product arrangement and the materials should be stored in
predetermined positions. Racks and assembly tables should be used.
Preparing the materials, Changing
the setting positions of the materials, Binding and undoing the materials,
Checking the quantity of materials.
Trouble: Prevention
and maintenance of the correct state. The thread to be used should be
investigated. Needle thread should be used. How to handle the sewing machine.
How to depress the foot pedal.
Re-threading the machine in case
of thread breakage, Replacing a broken needle, Changing a needle, Malfunctions
of the sewing machine, vacuum board or press
Preliminary arrangement:
Work training. How to educate the workers. Written instructions. Report system.
Instruction, Report, Education, Consultation
1 comment:
Harrah's Cherokee Casino & Hotel - Mapyro
Get directions, reviews and information for Harrah's 목포 출장샵 Cherokee Casino & 부산광역 출장샵 Hotel in Cherokee, NC. 인천광역 출장마사지 777 Harrah's Blvd. 보령 출장안마 Cherokee, NC 28719. Map. 창원 출장샵
Post a Comment